Each procedure, every area, every single purpose in EPG is demanded to be completed a single action following yet another, carefully and cautiously, from content variety, reformation to producing accessories, from parts heat therapy to computerized assembly, from high quality manage to merchandise inspection and testing and from purchase dealing to after product sales provider. Our merchandise are made by modern day computerized equipment and products. Meanwhile, our items are produced according to high high quality standards, and complying with the international superior regular standards. 2016 QDY sequence bridge foundry crane 16 sol3 period2-fifty sol10 ton-ten period5-31 period5m
Ladle overhead crane is EPTT products to lifting liquid steel ladle period of time The primary hoist is operated at high velocity so as to suit in higher productiveness of warmth hXiHu (West Lake) Dis.Hu (West Lake) Dis. and heat transportation interval The pace handle selection speed management ranges can be understood by an option of variable stator voltage control or frequency handle of motor velocity period of time
The ladle overhead crane designed with protection and trustworthiness comma EPTT strategy comma rigid structure comma very good economic climate and sturdiness comma and easy upkeep interval
Ladle overhead crane are divided into 4 kinds colon
– EPTT-girEPTTtwo-rail sort lparthe ladle cranes with more compact lifting ability rpar
– EPTT girEPTTfour-rail sort lparthe ladle cranes with scaled-down lifting capability rpar
– 4-girEPTTfour-rail variety lparladle cranes with more substantial lifting ability rpar
– 4-girEPTTsix-rail sort lparthe lade cranes with further lifting potential rpar
The ladle overhead cranes have following alternatives time period
one period of time Variable velocity control for each mechanism
2 period Rotary lifting EPTT semi
three period Variable length amongst gantry hooks semi
four period Overload limit and warming exhibit semi
5 period of time Load weighing and display semi
six period of time A few dimensional lifted point location and show
7 interval PLC manage and fault detection comma exhibit comma record and printing program
8 time period Defense of cranes at the identical bay from impacting semi
Just explain to us your thorough need comma Ladle overhead crane will be customized manufactured for your assignments time period
Configuration
2016 QDY series bridge foundry crane 16 sol3 period2-fifty sol10 ton-ten period5-31 period5m
1- EPTT Mechanism
– Open winch trolley mixed with motor comma EPTT comma EPTT brake comma drum comma sheaves comma coupling comma brake drum comma magnets and so forth interval
– Rigid box variety trolley frame
– Wound Rotor three-stage asynchronous metallurgy motor
– Harden Teeth EPTT
– EPTT Drum Brake lpar double brake to assurance the basic safety rpar
– Plate-rolled Drum kits
2-Stop Carriages
– Solid Flanged wheel
– Rigid welded box kind beam
– Compact format
three-Griders
– 2 major girders are welded box sort
– EPTT colon carbon metal with large high quality of Q235B or Q345B
– The major girEPTTis linked by power bolt time period
– Weld joint tested by X ray or ultrasonic examination semi
– Modula design and style
– Designed Deflection le1 sol800 of span
four-Manage
– Cabin manage
– Independent pendent control as choice
– Wireless handle as alternative
5-Electric Part
– Conductor EPTT offer
– All hoist and crane actions are independent and can be run EPTTltaneously interval
– Safety diploma IP55
-The factors are positioned in a upkeep welcoming way comma and the EPTT structure gives with good protection
– Festoon cables are suspended on cable saddles comma fastened to cable trolleys comma operating in a galvanized C-monitor period
six-Painting
– Corrosion security via rust removing by mechanical shot blasting SA two period5
– Very first layer of coating epoxy thirty microns
– 2nd layer of coating epoxy 30 microns
-3rd Layer of coating of polyurethane 40 microns
-Regular thickness colon about a hundred microns
-Colour colon yellow or Orange as for every requirements
seven-Secure Protection
– Crisis-off change
– Overload defend
– Earth safety
– Zero Placement Security
– Cross journey and EPTT travel defense
– EPTT vacation defense
– Overheating security of motor
– Alarm Bell and Lamp
Attributes Benefits
2016 QDY collection bridge foundry crane 16 sol3 period2-fifty sol10 ton-ten period5-31 period5m
– EPTT responsibility substance managing
– Large efficiency
– Higher overall performance elements with cost-effective value
– EPTTnomical spare parts
– two several years guarantee
– EPTT upkeep and EPTT replacement of parts
– Reduced EPTT of transportation EPTT and quick installation
EPTT Capacity lpart rpar | 200 sol50 | 225 sol65 | 240 sol80 | 280 sol65 | 320 sol80 | |
Functioning Course | A7 | A7 | A7 | A7 | A7 | |
Span lparm rpar | 28 | 27 | 22 | 21 | 24 period5 | |
EPTT Top | Primary hook | 26 | 32 | 25 | 24 | 28 |
AuXiHu (West Lake) Dis.liary hook | 26 | 34 | 27 | 26 | 32 | |
Pace | Principal hook | 6 | eleven | seven | ten | seven period5 |
AuXiHu (West Lake) Dis.liary hook | ten | eleven | 9 period6 | 12 | ten | |
Main Trolley | 41 | 41 | 35 | thirty | 29 | |
AuXiHu (West Lake) Dis.liary Trolley | 38 | 39 period5 | 38 | 39 | 39 | |
Crane | 78 | eighty four | eighty | 76 | 58 | |
Proportions lparmm rpar | H | 6900 | 7000 | 7000 | 7600 | 7800 |
H1 | 6000 | 5990 | 5650 | 6400 | 6500 | |
H2 | 1650 | 1400 | 1350 | 1350 | 1500 | |
B | 1700 | 17300 | 18500 | 19200 | 19500 | |
B1 | 10000 | 15710 | 11250 | 12000 | 12500 | |
B2 | 3200 | 3300 | 3800 | 3800 | 5000 | |
Limit dimestion lparmm rpar | b | 450 | 450 | 450 | five hundred | five hundred |
H3 | 6000 | 5800 | 5500 | 5900 | 6000 | |
H4 | 1000 | 1000 | 1500 | 1500 | 1700 | |
S1 | 2600 | 2500 | 2800 | 3200 | 3300 | |
S2 | 3000 | 3000 | 3200 | 3500 | 3500 | |
S3 | 2000 | 2200 | 2400 | 2400 | 2600 | |
S4 | 1600 | 1600 | 2800 | 2800 | 3000 | |
Max wheel load lparkN rpar | 530 | 550 | 545 | 595 | 650 | |
Steel keep track of advised | QU120 | |||||
EPTT supply | 3-Period A periodC period of time 380V 50Hz |
EPTTilor Produced
– GirEPTTcan be divided into pieces and linked with bolts at internet site to reduce the transportation EPTT
– Frequency converter methods realizing infinitely variable speed manage and small load swing for your exact loading and unloading specifications period of time
– Large span over 35M
– Substantial touring velocity for substantial working effectiveness
Crane Inquiry Data
Crane Inquiry Data Sheet | ||||||
Client colon | ||||||
Day colon | ||||||
Crane variety | Overhead Traveling Crane lpar double girEPTTSingle girEPTT rpar | |||||
Gantry Crane lpar double girEPTTSingle girEPTT rpar | ||||||
Ability lparT rpar | Major EPTT | Aux period of time EPTT | Bridge | |||
Necessary Hook Carry lparM rpar | Principal hoist | Aux period of time EPTT | ||||
Runway Size lparM rpar | ||||||
Responsibility Group | A1-A8 is dependent on your real demands | |||||
Elevate Figures | times for every hour | |||||
Operate several hours | hrs for each day | |||||
Ambient Temperature | Max period of time | Min period | ||||
EPTT EPT | ||||||
Crane Operation | indoor | outdoor | ||||
EPTT provide | Section Volts Hz | |||||
Management Approach | Cabin EPTTr Wi-fi | |||||
EPTT Accessories Desired | ||||||
Headroom Clearance lparmm rpar |
Make contact with US | |
Wayne He | |
Mobile colon plus86 13770780269 | |
Phone colon plus86 571 86253526 | |
Co time period Internet site colon http colon sol solwww periodshengqicrane periodcom sol | |
Our organization provides the service for overhead crane and gantry crane planning comma deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ing comma producing comma transporting comma installation comma operator coaching and servicing period For more info and information about our merchandise comma incXiHu (West Lake) Dis.Hu (West Lake) Dis. design of the crane comma protection features of every variety of crane comma application of the EPTT comma specialized parameters of the crane comma manufacturing process comma right after-sale support comma major element of the crane commapackage for the crane comma loading photographs of cranes and all other details about our goods comma please kindly speak to with MR periodWayne comma MR periodWayne will give you a help as considerably as achievable interval |
Your sort inquiry comma Our sincere quotation excl