Due to our vast product variety and abundant ordeals in this industry, Our product variety consists of all varieties of helical gear, spur gear, bevel equipment, equipment rack, worm equipment, sprockets,chains, bearings. Our technicians and engineers have 23 many years of Experience in the Bearing Industry.
R sequence Helical Geared EPTT Attributes
1. Functions:
one. Higher performance: ninety two%-97%
two. Compact framework: Small offset output, two phase and a few stage are in the identical box.
3. Higher precision: the EPTT is made of substantial-good quality alloy metal forging, carbonitriding and hardening remedy, grinding process to guarantee high precision and stable running.
4. Substantial interchangeability: hugely modular, serial design, sturdy versaEPTTty and interchangeability.
2. EPTT parameters
Ratio | 3.41-289.seventy four |
Enter EPTT | .12-160KW |
Output torque | sixty one-23200N.m |
Output velocity | five-415rpm |
Mounting sort | Foot mounted, flange mounted, foot and flange mounted, single-stage foot mounted, single phase flange mounted, Flange-mounted with extended bearing hub |
Input Strategy | Flange enter(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor |
Brake Release | EPT-guide launch(lock in the brake release situation), EPT-manual release(autom-atic braking place) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Situation | M1, M2, M3, M4, M5, M6 |
Variety | R17-R167 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
EPTT material | EPTT200 substantial-toughness cast iron from R37,forty seven,fifty seven,sixty seven,seventy seven,87 |
EPTT content | EPTT250 High power solid iron from R97 107,137,147,157,167,187 |
Heat treatment method EPTT | carbonitriding and hardening therapy |
Efficiency | 92%-ninety seven% |
Lubricant | VG220 |
Safety Course | IP55, F course |
EPTT Generate
ZheJiang EPTT Push Co.,Ltd,the predecessor was a condition-owned armed forces mould EPTTrprise, was estabEPTTd in 1965. EPTT EPTTizes in the full EPTT EPTT solution for substantial-end products producing EPTT based on the intention of quotPlatform Item, Application Style and Professional Services quot.
EPTT have a strong technical force with in excess of 350 workers at current, incXiHu (West Lake) Dis.Hu (West Lake) Dis. above thirty engineering experts, 30 good quality inspectors, masking an spot of 80000 square meters and kinds of EPTT processing EPTTs and tests equipments. We have a great basis for the business software deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and services of high-end pace EPTTs amp variators owning to the provincial engineering EPTT analysis cEPTTr,the lab of EPTT velocity EPTTs, and the base of contemporary R ampD.
Our Staff
EPTT Management
EPTT:Insist on EPTTrovement,Attempt for Excellence With the deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment of gear manufacturing indurstry,client by no means satirsfy with the current high quality of our products,on the opposite,wEPTT the worth of high quality.
EPTT plan:to improve the total stage in the area of EPTT EPTT
EPTT See:Steady EPTTrovement , pursuit of excellence
EPTT Philosophy:EPTT EPTTs price
3. Incoming EPTT Control
To set up the AQL suitable stage of incoming materials management, to supply the material for the EPTT inspection, sampling, immunity. On the acceptance of experienced merchandise to warehousing, substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd merchandise to just take return, check, rework, rework inspection responsible for tracking bad, to keep an eye on the supplier to consider corrective
actions to avert recurrence.
four. Procedure EPTT Handle
The manufacturing website of the first evaluation, inspection and ultimate inspection, sampling according to the requirements of some projects, judging the quality alter trend
located irregular phenomenon of manufacturing, and supervise the creation office to boost, get rid of the abnormal phenomenon or point out.
5. FQC(Ultimate QC)
Right after the producing department will full the merchandise, stand in the customer’s placement on the concluded merchandise high quality verification, in order to ensure the good quality of
customer expectations and needs.
6. OQC(Outgoing QC)
Right after the item sample inspection to deterEPTT the competent, allowing storage, but when the finished solution from the warehouse just before the formal supply of the goods, there is a check out, this is called the cargo inspection.Examine content:In the warehouse storage and transfer status to validate, even though confirming the delivery of the
merchandise is a solution inspection to deterEPTT the certified merchandise.
7. Certification.
EPTT
Shipping and delivery